January 2021
Elecnor awards Gruponet the installation of the TETRA coverage network in the tunnels of the Pedralba-Vilariño section of the AVE in Galicia
Elecnor has assigned Gruponet to carry out the installation, testing and start-up of the TETRA coverage extension system in the following tunnels of the Pedralba-Vilariño sub-section of the AVE in Galicia: La Canda, Cañizo and Espiño. Read Moreā¦