Gruponet is awarded the installation of the radiant cable for the GSMR coverage of the railway tunnels of the Pajares variant
Gruponet has been awarded, by the UTE INST TUNELES VARIANTE PAJARES, of the leaky cable installation works in the Pajares and Pontones tunnels of the Pajares bypass, of the León-Asturias High Speed Line, in the section La Robla – Pola de Lena Read More…
The UTE Indra Alstom has Gruponet for the installation of the TETRA coverage network in the AVE tunnels in Galicia, in the Vilariño-Taboadela section
The UTE Indra Alstom has assigned Gruponet to carry out the installation, testing and start-up of the TETRA coverage extension system in the following tunnels of the Vilariño-Taboadela sub-section of the AVE in Galicia: Bolaños, Portocamba and Cerdedelo. Read More…
Elecnor awards Gruponet the installation of the TETRA coverage network in the tunnels of the Pedralba-Vilariño section of the AVE in Galicia
Elecnor has assigned Gruponet to carry out the installation, testing and start-up of the TETRA coverage extension system in the following tunnels of the Pedralba-Vilariño sub-section of the AVE in Galicia: La Canda, Cañizo and Espiño. Read More…
Gruponet will install TETRA coverage of the new Medro headquarters in Madrid
Amper awards Gruponet the installation of the TETRA coverage project of the new Metro de Madrid headquarters, a 12-storey building with two basements located close to Plaza de Castilla. Read More…
AMPER awards Gruponet the TETRA coverage of line 9 of the Madrid Metro
Gruponet has been awarded the contract by Amper for the coverage of the Metro de Madrid TETRA network on line 9, after several years of collaboration on different Metro lines. Read More…